The Owner of a textile industrial firm needs a feasibility study of a new boiler and its gas cleaning system. The CHP installed and operating giving power to the production process is fed by biomass; W.T.E. was appointed to enhance the performances of the combustion and of the emissions of gases consequentlly. The study offers possible improvement scenarios to reach the application af the BAT.