ALSTOM POWER Italia required the provision of QA/QC engineering services.
The quality plan referred to a Project of an upgrading of desulphurisation system on an existing waste to energy plant (Brescia). The main scope of work included reducing emissions of sulphur oxides (SOx) at the stack and optimising the consumption of chemicals in the meantime.
W.T.E. studied the applicability of internal quality management system procedures to specific projects. In a second phase W.T.E. issued a Project quality plan complying with ISO 10005.