Modifications of existing lines, with installation of booster fans
W.T.E. was ordered to deliver a feasibility study of the upgrade of booster fans allowing the discharge of combustion fumes, one fan for each line of the incineration plant with fluidised bed technology in Macomer.
In the project the new fans are placed before the existing ones and put between the way out of bag filter and the entrance into the SCR reactor.
W.T.E. delivered the control logics of the whole system.