TOSSILO Spa, owner of the MSW incineration plant in Macomer, appointed W.T.E. to draft the technical and economical prefeasibility study giving:
- the lay out and the dimensioning of a new incineration plant with 30 MWth capacity, to be built in the area of the existing one, operating with two fluidised bed furnaces;
- grate combustion system providing an yearly average thermal flux of 28 MW.
W.T.E. delivered:
a general lay out,
a preliminary dimensioning of the main sections of the plant and their process
three different solutions of lay out and sections.