Fichtner Italia Spa commissioned W.T.E. the support engineering and the technical specifications for equipment to be installed in two integrated solar - biomass thermoelectric plants CSP, in Gela -Sicily (12 MWe) and in S.Quirico- Sardinia (10.8 MWe).
WTE has elaborated functional specifications with design requirements related to the characteristics of biomass, Power block, BoP.