Daneco Impianti SpA ordered to W.T.E. the engineering for offer related to a project of a new waste to energy plant to be realised in Sassari (Sardinia).
The capacity of the plant would be 270.000 tons/year of municipal solid waste to be incinerated by two lines of 35 MWth-17 MWe.
W.T.E. delivered basic engineering, all technical specifications, metric calculations of main sections of plant (furnace-boiler, flue gas cleaning system, thermal cycle), drawings of parts and of assembly.