W.T.E. signed a contract with ATZWANGER AG for the design of two boilers (20 tons/hour steam, T=370 øC, p=36 bar), to be installed at the AAMPS Livorno incineration plant.
The contract included the expediting activity, the design of the combustion control system and the training of operators and management of the plant.
The boilers were designed in order to run 8000 h/y without stop.