W.T.E. carried out the design of a new parallel flow water steam superheaters (SH) for the existing boilers (2 x 17.5 tons/hour of steam) on the incineration plant owned by GEOFOR SPA.
This solution was required in order to reduce the recorded heavy corrosions on the tubes due to clorine acid action.