W.T.E. delivered basic engineering to ALSTOM Power Italia for the study of a system for the combustion of hospital waste in the furnaces of the incineration facility " Silla 2", owned by AMSA.
The capacity of the plant was: 3 lines of 70 MWth each, turnines of 60 MWe and complete flue gas cleaning system.