W.T.E. delivered to TOSSILO Spa project of a new combustion control system in order to allow the maximum reduction of pollutant emission, especially CO and TOC emissions, of the incineration plant in Macomer operating with two fluidised bed furnaces.
The analysis and tests made by W.T.E. specialists pointed out some critical aspects of the process (the lay out of the plant, existing control logics, load variation impacts) and technical proposals were reported to the Client.