Thermal cycle

mascioni

CHPP 50MWth from coal to biomass with 15MWe new thermal cycle. Feasibility study (2010)

Mascioni S.p.A. (Cuvio-VA), an important Italian yarn-dyeing factory, appointed W.T.E. to design and engineer the way to substitute coal for PKS (Palm Kernel Shell) and dried sewage sludge in its 50 MWth boiler. The boiler had to deliver superheated steam (455 °C e 64 bar) to a co-generative thermal cycle, including a new full condensing

CHPP 50MWth from coal to biomass with 15MWe new thermal cycle. Feasibility study (2010) Read More »

Feasibility study (2005)

Troubleshooting and availability improvement  of the thermal cycle installed on incineration plant owned by A.AM.P.S. in Livorno (turbogenerator 6.7 MWe gross). Following this study W.T.E. received the order to carry out the revamping of thermal cycle and auxiliaries.

Feasibility study (2005) Read More »

Engineering services

Feasibility study: integration of a 3 x 61 MWt MSW incineration plant with a combined turbogas cycle (2004)

A.M.S.A. Spa owner of the MSW incineration plant in Milan, needed a technical and economical viability of the integration of a 3 x 61 MWt MSW incineration plant with a turbogas cycle. W.T.E. studied the impact on generation performances was developed by the analysis of 24 different operational functioning, related to weather conditions during the

Feasibility study: integration of a 3 x 61 MWt MSW incineration plant with a combined turbogas cycle (2004) Read More »