Preliminary study of co-combustion sludge, coal and biomass (2011)
A feasibility study was carried out to evaluate, both form economic and technical point of view the possibility to dry organic and industrial slurry to feed the 51.7 MWth coal boiler as an alternative to coal. Mascioni Spa, co-generative power station, Cuvio (VA): Some plant figures: -Maximum Continuous Rate (MCR): 51.7 MW -Maximum gross power […]
Preliminary study of co-combustion sludge, coal and biomass (2011) Read More »