Engineering: hospital waste combustion system (2001)

W.T.E. delivered basic engineering  to ALSTOM Power Italia  for the study of a system for the combustion of hospital waste in the furnaces of the incineration facility ” Silla 2″, owned by AMSA. The capacity of the plant was: 3 lines of 70 MWth each, turnines of 60 MWe and complete flue gas cleaning system.

Engineering: hospital waste combustion system (2001) Read More »