Maintenance services (2005)
On-line cleaning of line 1 boiler installed on the MSW incineration plant in Ravenna, managed by Ecologia Ambiente SpA.
Maintenance services (2005) Read More »
On-line cleaning of line 1 boiler installed on the MSW incineration plant in Ravenna, managed by Ecologia Ambiente SpA.
Maintenance services (2005) Read More »
From 2002 to 2005 W.T.E. provided to M.E.T.A. Spa many interventions of ordinary maintenance of the furnace-boiler system . These maintenance operations were realised on the three lines of the waste to energy plant sited in Modena. Maintenance services included: cleaning on line by Bang & Clean system of boilers and degasers; Measurement of wall
Maintenance services (2005) Read More »
W.T.E. provided the on-line cleaning of line 1 of the boiler installed on the incineration plant managed by AGSM VERONA , by the Bang & Clean system.
Maintenance services (2005) Read More »
W.T.E. provided the on-line cleaning of line 2 of the boiler installed on the incineration plant managed by CORE Spa, by the Bang & Clean system.
Maintenance services (2005) Read More »
FExamination on corrosion damages of a boiler installed on the MSW incineration plant in Colleferro. The boilers were provided by Lurgi-Pianimpianti. The plant was managed by G.A.I.A. SPA, multiutility.
Study of corrosion damages-EfW plant boilers Colleferro (2004) Read More »
W.T.E. studied a new cooling system at the interface between lower and upper grates for the waste to energy plant owned by META Spa. During the ordinary running of the furnaces the Client observed the recurrently build up of molten slag on the steps and wanted to solve that inconvenient in order to allow the
Consulting about malfunctioning (2003) Read More »
WTE was appointed by MATEC to verify the equipment status of medical waste incineration plant after a destructive explosion occurred during first start up. The plant was located in Paderno Dugnano. Major damages on boiler and gas cleaning system were recorded. After the analysis WTE was designated to deliver the general project of the revamping
Engineering for revamping of hospital waste plant (2003) Read More »
Measurement of wall thickness, VOC catalytic combustor
Engineering services (2003) Read More »
CON.SER.VCO, the owner of the incineration plant sited in Mergozzo (VCO), needed a detailed report on the actual state of the refractory lining in the furnaces. W.T.E. delivered an objective analysis about the conditions of furnace walls and some suggestions concerning maintenance and refurbishment costs .
Engineering services (2002) Read More »
The GPC Gruppo Public Consult Spa committed to W.T.E. the expediting and the vendor compliance audit during the manufacturing of a steam boiler of 20 tons/hour to be installed on the third line of the waste to energy plant sited in Schio (Italy).
Expediting and vendor compliance of boiler (2002) Read More »