Spare parts supply (2012)
W.T.E. delivered several spare parts (thermocouple) to Dister Energia Spa. Frequent customers as Dister turn to W.T.E. for urgent specific supplies.
Spare parts supply (2012) Read More »
W.T.E. delivered several spare parts (thermocouple) to Dister Energia Spa. Frequent customers as Dister turn to W.T.E. for urgent specific supplies.
Spare parts supply (2012) Read More »
Design and installation of a new dust recirculation system
Design and installation of a new dust recirculation system (2010) Read More »
Modifications of existing lines, with installation of booster fans W.T.E. was ordered to deliver a feasibility study of the upgrade of booster fans allowing the discharge of combustion fumes, one fan for each line of the incineration plant with fluidised bed technology in Macomer. In the project the new fans are placed before the existing
Feasibility study of installation of booster fans, wte plant in Macomer (2010) Read More »
Pre-feasibility study of the convertion of the combustion system installed on the incineration plant owned by Veolia Servizi Ambientali Tecnitalia Spa in Gioia Tauro (RC). The existing fluid bed furnaces were fed with RDF and they would be transformed into moving grate furnaces fed with MSW. The capacity of the plant was 49 MWth. W.T.E.
Ecosesto SpA, coordinated by Actelios Spa, ordered to W.T.E. the design and the supply of a superheated steam boiler and auxiliary equipment for a power plant, located in Rende (Italy), fed by wood chips and olive residues. The plant was undergoing a complete revamping system in order: 1) to increase efficiency of energy recovery and
Design & supply of a superheated steam boiler (2009) Read More »
Geofor Spa -Pisa Incineration plant 2 lines x 15 MWt Design of two isolating dampers for loading waste chutes.
Design of isolating dampers for MSW/RDF incineration plant (2008) Read More »
Coordination of Distributed Control System (DCS) engineering
Coordination of Distributed Control System (DCS) engineering (2008) Read More »
Multiple measurements of wall thickness on the MSW incineration plant in Modena, owned by Gruppo Hera. The measurements were made on the three lines, after the request of the management.
Maintenance services (2006) Read More »
W.T.E. provided the on-line cleaning of the boiler installed on the power plant owned by MASCIONI SPA, by the Bang & Clean system.
Maintenance services (2006) Read More »
W.T.E. carried out the design of a new parallel flow water steam superheaters (SH) for the existing boilers (2 x 17.5 tons/hour of steam) on the incineration plant owned by GEOFOR SPA. This solution was required in order to reduce the recorded heavy corrosions on the tubes due to clorine acid action.
Design of Superheater – MSW Incineration plant-Geofor Spa-PI (2006) Read More »