Furnace

Pre-feasibility study of furnace replacement on EfW plant (2005)

W.T.E. was encharged to study the replacement of the existing furnace system of the MSW incineration plant managed by SE.VER.A in Castelnuovo G.na. The object of the prefeasibility study was to indicate: – the project of converting the existing furnace by its modification  from “adiabatic” to “non adiabatic” ,with the minimum adaptation of the other […]

Pre-feasibility study of furnace replacement on EfW plant (2005) Read More »

Engineering for revamping of furnaces on MSW incineration plant (2004)

TECNOCASIC had to realise the revamping of MSW incineration plant located in Cagliari neirbourough in order to comply with environmental Italian law. Main sections of plants were replaced after new design of all the system. W.T.E. was required to deliver the basic engineering, thermodimanic calculation of new process, and detailed engineering  for the reconstruction of

Engineering for revamping of furnaces on MSW incineration plant (2004) Read More »