Preliminary engineering of a heating system (2021)
Preliminary engineering of a heating system to dry refractory lining following automatically an assigned thermal profile.
Preliminary engineering of a heating system (2021) Read More »
Preliminary engineering of a heating system to dry refractory lining following automatically an assigned thermal profile.
Preliminary engineering of a heating system (2021) Read More »
Thermodynamic modelling and lay out drawing of biomass 14 MWe plant to be build in Casei Gerola, owner Enel Green Power (F2i)
Basic engineering for the biomass plant – Casei Gerola (2017) Read More »
The Client, Terni Biomassa Srl, appointed W.T.E. to produce a technical advice about the premature failure of the refractory lining installed in the furnace and designed to burn paper pulper residues. Serious damages on the refractory lining of the combustion chamber were observed after few months of run. Main characteristics of the boiler: steam flow
Advice about refractories premature failure (2016) Read More »
Feasibility study to convert a furnace, fed by diesel oil, to RDF (Refuse Derived Fuel), throughput 150 MWe W.T.E. designed a mathematical model based on characteristics of existing boiler and suitable to describe air suspended fuel burning and energy recovery in combustion chamber. Reduced steam thermodynamic parameters were assumed in order for the boiler tubes
Feasibility study to convert furnace from oil to RDF (2013) Read More »
Design, engineering and installation of gas piping, regulating valves and five natural gas burners on lines 1 and 2 of the waste to energy plant owned by ACEGAS-Aps, in Padova.
Design & supply of furnace burners for MSW plant (2011) Read More »
W.T.E. provided to the Client, TOSSILO Spa, the project of a new grinding & feeding system to be installed on the existing incineration plant, in Macomer (Sardinia). The new feeding system was required suitable for non sorted waste brought to the plant with large dimension. The project developed opted for a significant modification of the
Engineering of a new grinding-feeding system for incineration plant (2010) Read More »
Design, manufacturing, supply start up and commissioning of a 24 MWt furnace fed by wasted biomass (wood chips, wine production waste, straw, kernel and stones), including auxiliaries and Process & Combustion Control. Maximum Quantity of biomasses to be burnt: 10 tonnes hour of grape’s harvest and winery by-products at 1850 kcal/kg. LHV shall be in
Design and supply 24 MWt biomass fired furnace (2007) Read More »
W.T.E. signed a contract with ATZWANGER AG for the design of two boilers (20 tons/hour steam, T=370 øC, p=36 bar), to be installed at the AAMPS Livorno incineration plant. The contract included the expediting activity, the design of the combustion control system and the training of operators and management of the plant. The boilers were
Design of two HRSG on a waste to energy plant (2007) Read More »
Analisys of Fluised bed malfunctioning Studio di fattibilità per la sostituzione del forno a letto fluido esistente sulla Line 2- Termovalorizzatore di Macomer, della società TOSSILO Spa, con un forno a griglia di tipo non-adiabatico integrato con il generatore di vapore. Il progetto di revamping fornito da W.T.E. ha suggerito le modifiche utili all’ottenimento di
Consulting on malfunctioning of fluized bed on wte plant (2006) Read More »
MASCIONI SPA ordered W.T.E. to provide the on-line cleaning service on the furnace and the boiler of the cogeneration plant existing on the industrial area, Cuvio (VA).
Maintenance services (2006) Read More »