Engineering services (2023)
Engineering services for development of several projects for process and design of new waste to energy and sludge treatment plant.
Engineering services (2023) Read More »
Engineering services for development of several projects for process and design of new waste to energy and sludge treatment plant.
Engineering services (2023) Read More »
Following the previous engineering services provided, Redecam Group asked to W.T.E. to update the flow control diagrams of the gas cleanign system of a biomass to energy plant
Control logic for an industrial dry gas cleaning system (2021) Read More »
Drafting documents as required for defining the offer price of four systems for storage and dosing the Ammonia installed on four Power plants- ENEL
W.T.E. provided engineering services to Redecam Group in order to elaborate the flow control diagrams of the gas cleanign system of a biomass to energy plant
Process engineering for a gas cleaning system -REDECAM GROUP Spa (2020) Read More »
The client, owner of the wte plant Silla2 in Milan, appointed W.T.E. to provide a solution for the treatment of the primary air, drawn from the refuse pit of the plant. WTE designed a system in two stages. A self-cleaning filter, operating as metallic sieves, was recommended. As the plant needed a deeper cleaning system
Design and basic engineering (2016) Read More »
Redecam Group Spa and W.T.E. signed an agreement concerning the provision of engineering services, precisely of the process engineering and technical consulting in the field of gas cleaning system (Sodium-bicarbonate Dry Flue Gas Cleaning System)
Engineering services (2017) Read More »
W.T.E. provided engineering services to Redecam Group in the project of a new Flue Gas Cleaning System – dry type
Engineering services (2017) Read More »
Carlo Gavazzi Impianti requested W.T.E. to deliver engineering services in order to complete the documents for tender concerning the thermal cycle (27 MWe) and the flue gas cleaning system of a new biomass to energy plant. W.T.E. calculated energy and mass balances both in- and off-design and delivered Process Flow Diagrams.
Offer engineering (2013) Read More »
SIA Ventspils Siltum, Multitutility of Ventspils City (Latvia) is in charge of managing the urban district heating. In 2014 Ventspils Siltum commissioned W.T.E. to carry out the technical-economic feasibility study to revamp an existing furnace-boiler, originally designed to be fed by coal following Russian technology. To reduce coal consumption W.T.E. studied the conversion to RDF
Feasibility study of a CHPP plant: from coal to RDF/biomass (2014) Read More »
The Client requested W.T.E. to provide mechanical and thermodynamic standardisation, performance test procedure and erection engineering analysis about boilers to be revamped by SCR deNOx systems, to treat flue gas released from a natural gas (gas turbine). W.T.E. delivered technical specifications for work instruction, SCR catalyst, ammonia injection, storage and dosing, ammonia grid, flow control
SCR standardisation on GT HRSG boilers (2015) Read More »