Design and basic engineering (2017)
Project of auxiliary systems for the emergency transport of fly ashes to load trucks directly.
Design and basic engineering (2017) Read More »
Project of auxiliary systems for the emergency transport of fly ashes to load trucks directly.
Design and basic engineering (2017) Read More »
Functional testing of mechanical hammer cleaning system installed on a biomass to energy plant.
Maintenance services – functional testing (2012) Read More »
Ansaldo Caldaie SpA ordered to W.T.E. the engineering activity related to a new system to remove flying ashes in dense phase on a coal energy plant, 2 x 150 MW lines in Mohammedia, Morocco.
Engineering and procurement services (2006) Read More »
In the ambit of major revamping of the waste to energy plant owned by ECOFOR (ex GEA) in Pisa, W.T.E. delivered basic and detailed engineering for a mechanical conveying system ashes coming from boilers and from gas cleaning section. W.T.E. provided:Â calculation of ashes production;Â calculation of nominal capacity of each machinery installed; the project
Basic and detail engineering of Fly ash conveying system (2001) Read More »