Offer engineering, Biomass plant (2004)
W.T.E. collaborate for an offer engineering related to a complete Biomass to Energy system.
Offer engineering, Biomass plant (2004) Read More »
W.T.E. collaborate for an offer engineering related to a complete Biomass to Energy system.
Offer engineering, Biomass plant (2004) Read More »
Consulting – on a continuous basis – on few critical items in the management and performances of the MSW incineration plant, located in Vercelli and operated by Termomeccanica Group on behalf of the municipal company ATENA, the owner.
Consulting about malfunctioning of the EfW plant (2005) Read More »
Technical and economical viability of a MSW incineration plant (2 x 47 MWth lines, thermal cycle with 19 MWe T/G)
Feasibility study of a wte plant (2003) Read More »
W.T.E. developed the structural engineering of the silos to be erected in a gravel pit. During the construction serious structural faults arised and W.T.E. was appointed to verify calculation and carry out the remediation project in order to reinforce the load-bearing structure. Final client Cava ARMATI- Sovere (BG)
Structural engineering of gravel silos installed in a pit (2003) Read More »
Daneco Impianti SpA ordered to W.T.E. the engineering for offer related to a project of a new waste to energy plant to be realised in Messina(Sicily). The plant would process 430.000 tons per year of municipal solid waste by three lines of 62.5MWth-53 MWe. W.T.E. delivered basic engineering, all technical specifications, metric calculations of main
Offer engineering (2002) Read More »
Review of design criteria of a slaughterhouse waste incineration system (expert opinion)
Consulting in a legal advice (2002) Read More »
Consulting on untimely collapse of furnace roof occurred on the waste to energy plant managed by ACCAM sited in Busto Arsizio (Varese)
Consulting on failure (2002) Read More »
Daneco Impianti SpA ordered to W.T.E. the engineering for offer related to a project of a new waste to energy plant to be realised in Sassari (Sardinia). The capacity of the plant would be 270.000 tons/year of municipal solid waste to be incinerated by two lines of 35 MWth-17 MWe. W.T.E. delivered basic engineering, all
Offer engineering (2002) Read More »
ALSTOM required to W.T.E. to develop: the coordination between all different control systems installed on the waste to energy plant (GEA-Pisa) the draft of commissioning and start-up procedures of the whole plant, with special analisys of procedures for furnaces; study of testing procedure methodic.
Engineering services (2001) Read More »
GEA Spa, owner of a waste to energy plant in Ospedaletto (Pisa), decided the total refurbishment of the two furnaces, including feeding systems, also for hospital wastes and post combustion chambers. W.T.E. was appointed to deliver basic engineering and technical specifications concerning furnaces and combustion grates, boilers, auxiliary systems; the arrangement of automatic control and
Construction management of waste to energy plant’s revamping (2001) Read More »