Design and supply (2007)
Development of detailed engineering related to revamping of Cremona MSW incineration line 1 and supply of the new concept variable pressure auxiliary boiler.
Design and supply (2007) Read More »
Development of detailed engineering related to revamping of Cremona MSW incineration line 1 and supply of the new concept variable pressure auxiliary boiler.
Design and supply (2007) Read More »
Transforest Srl ordered to W.T.E. the preliminary technical report about a proposal of a 24 MWt biomass furnace to be submitted to Public authorities in order to receive the permit to build the plant. The plant should be mainly fed by green wood, wood scraps, but it is also designed to burn miscanthus.
Prefeasibility study of a biomass plant (2006) Read More »
2,5 MWe wood chips Biomass to Energy system
Feasibility study 2.5 MWe wood chips Biomass to Energy system (2006) Read More »
1 MWe wood chips Biomass to Energy system. Chips from a short rotation forestry
Feasibility study 1 MWe wood chips Biomass to Energy system (2006) Read More »
Biomass to Energy system, based on two 12 MWt lines supplying 5 MWe plus additional power to a district heating system.
Feasibility study of Biomass plant 5MWe plus power to district heating (2006) Read More »
GEOFOR SPA required a cost estimate of a new plant
Consulting on cost estimate of new plant (2006) Read More »
Proambiente GmbH required W.T.E. to deliver a feasibility study for authorisation to realise a biomass plant fed with wood chips and fowl manure for the production of 1MWe.
Feasibility study 1 MWe from wood chips/fowl manure (2006) Read More »
Transforest Srl was interested in construction of small biomass plants. W.T.E. delivered a the feasibility study.
Feasibility study of a small sized biomass plant (2006) Read More »
LEDOGA Srl, a company of Silvateam Group, needed to study the replacement of the existing old furnace (Breda) with a new one operating with a mobile combustion grate. W.T.E. delivered design and thermodynamic calculations.
Study to replace an existing furnace with a new one w/mobile combustion grate (2006) Read More »
Consulting on Electrical Energy Production in a MSW plant
Consulting on electrical energy production in a MSW plant (2005) Read More »