Complete System

furnace performance

Residual useful life prediction of boilers on a wte plant (2018)

A major Italian company, operating in the field of incineration and renewable energy, required W.T.E. to study the life extension of boilers installed on an existing incineration plant. Later, the analysis was extended to the whole plant. W.T.E. carried out the study for residual useful life evaluation through an analysis of ordinary and extraordinary maintenance

Residual useful life prediction of boilers on a wte plant (2018) Read More »

Engineering of the upgrading of wte plant to be fed by RDF (2019)

W.T.E. carried out an engineering analysis of Fusina-Venezia incineration plant, originally designed to burn MSW and now to be fed by high LHV RDF. W.T.E. has delivered furnace mass and energetic balances in all the characteristic points of combustion diagram, verifying the combustion parameters. W.T.E. has also designed the headers and nozzles of secondary air

Engineering of the upgrading of wte plant to be fed by RDF (2019) Read More »