Maintenance services (2006)
W.T.E. delivered maintencance services to the incineration plant managed by Hera in Ravenna. The plant needed an operation of on-line cleaning on the boiler of the line 1.
Maintenance services (2006) Read More »
W.T.E. delivered maintencance services to the incineration plant managed by Hera in Ravenna. The plant needed an operation of on-line cleaning on the boiler of the line 1.
Maintenance services (2006) Read More »
Analisys of Fluised bed malfunctioning Studio di fattibilità per la sostituzione del forno a letto fluido esistente sulla Line 2- Termovalorizzatore di Macomer, della società TOSSILO Spa, con un forno a griglia di tipo non-adiabatico integrato con il generatore di vapore. Il progetto di revamping fornito da W.T.E. ha suggerito le modifiche utili all’ottenimento di
Consulting on malfunctioning of fluized bed on wte plant (2006) Read More »
MASCIONI SPA ordered W.T.E. to provide the on-line cleaning service on the furnace and the boiler of the cogeneration plant existing on the industrial area, Cuvio (VA).
Maintenance services (2006) Read More »
Boiler erection expediting MSW Incineration plant SCHIO
Expediting during boiler erection MSW incineration plant (2002) Read More »
W.T.E. provided the basic engineering, the detailed engineering and the supply of a steam superheater (17,5 t/h, 48 barg, 385°C) to be installed on the existing waste to energy plant in Cremona, final client AEM Gestioni Srl.
Design and supply (2001) Read More »