Maintenance services (2012)
Dister Energia Spa, owner of a biomass cogeneration plant, appointed W.T.E. for the boiler refractories maintenance and for the boiler cleaning.
Maintenance services (2012) Read More »
Dister Energia Spa, owner of a biomass cogeneration plant, appointed W.T.E. for the boiler refractories maintenance and for the boiler cleaning.
Maintenance services (2012) Read More »
Dister Energia SpA, owner of a cogeneration biomass plant 24 MWth, fed by waste biomasses (grapes, kernels, straw) needed extraordinary maintenance services on pressure parts. W.T.E. carried on replacements of tubes in the superheater and minor maintenance on the refractory.
Maintenance services (2012) Read More »
Dister Energia Spa is the owner of a biomass plant with 24 MWth capacity, whose furnace was designed and constructed by W.T.E. Knowing W.T.E.’s reliability and timeliness in providing engineering services the Client requested a maintenance operation on SH and tube walls, including the issue of reports and final certifications for public Authorities.
Maintenance services (2011) Read More »
Moncada Energia, owner of a biomass plant, capacity 15,3 MWth per 3 lines, asked to W.T.E. a consulting concerning the analysis of main problems arised during the run and the review of the complete system with a new process combustion and control system. W.T.E. studied malfunctionings and delivered a preliminary project with improvements and budget.
Consulting on biomass to energy plant 15,3 MWth, 3 lines (2011) Read More »
W.T.E. was appointed to carry out expediting, quality control and engineering review for the new fired boiler, 60 MWth of capacity, to be installed on the MSW incineration plant in Bolzano. The boiler was mainly manufactured in India.
Expediting, quality control and engineering review. Incineration plant, Bolzano (2011) Read More »
Ecosesto Spa, a Falck Renewables’s company, commissioned to W.T.E. the design and supply of a new hammers cleaning system to be installed on the biomass boiler of the power plant (49 MWth) located in Rende (Italy). W.T.E.’s scope of work was supplying and super visioning the installation of the new system replacing the one already
Design & supply boiler cleaning system (2012) Read More »
Mascioni S.p.A. (Cuvio-VA), an important Italian yarn-dyeing factory, appointed W.T.E. to design and engineer the way to substitute coal for PKS (Palm Kernel Shell) and dried sewage sludge in its 50 MWth boiler. The boiler had to deliver superheated steam (455 °C e 64 bar) to a co-generative thermal cycle, including a new full condensing
CHPP 50MWth from coal to biomass with 15MWe new thermal cycle. Feasibility study (2010) Read More »
W.T.E. signed a contract with ATZWANGER AG for the design of two boilers (20 tons/hour steam, T=370 øC, p=36 bar), to be installed at the AAMPS Livorno incineration plant. The contract included the expediting activity, the design of the combustion control system and the training of operators and management of the plant. The boilers were
Design of two HRSG on a waste to energy plant (2007) Read More »
Development of detailed engineering related to revamping of Cremona MSW incineration line 1 and supply of the new concept variable pressure auxiliary boiler.
Design and supply (2007) Read More »
Design and supply of a Biomass to Energy system (installed power 1 MWe). Scope of supply including: boiler, condenser, degaser, auxiliary systems.
Design & supply of 1 MWe Biomass to Energy system (2006) Read More »