Waste to energy plant

Basic engineering for gas cleaning system, EfW Plant, Macomer (2005)

Progetto di rifacimento del sistema di depurazione fumi esistente (portata fumi 25.000 Nm3/h) sul termovalorizzatore a letto fluido di Macomer (NU). Ingegneria di base  completa di specifiche tecniche per la realizzazione di due filtri a maniche, di due sistemi in circuito chiuso di preriscaldo e di bypass fumi, del sistema di estrazione/scarico ceneri, degli strumenti

Basic engineering for gas cleaning system, EfW Plant, Macomer (2005) Read More »

Maintenance services (2005)

From 2002 to 2005 W.T.E.  provided to M.E.T.A. Spa many interventions  of ordinary maintenance of the furnace-boiler system . These maintenance operations were realised on the three lines of the waste to energy plant sited in Modena. Maintenance services included: cleaning on line by Bang & Clean system of boilers and degasers; Measurement of wall

Maintenance services (2005) Read More »

Engineering for revamping of furnaces on MSW incineration plant (2004)

TECNOCASIC had to realise the revamping of MSW incineration plant located in Cagliari neirbourough in order to comply with environmental Italian law. Main sections of plants were replaced after new design of all the system. W.T.E. was required to deliver the basic engineering, thermodimanic calculation of new process, and detailed engineering  for the reconstruction of

Engineering for revamping of furnaces on MSW incineration plant (2004) Read More »