Detailed engineering new slag transportation system (2009)
Detailed engineering, new slag transportation system
Detailed engineering new slag transportation system (2009) Read More »
Detailed engineering, new slag transportation system
Detailed engineering new slag transportation system (2009) Read More »
A.Am.P.S., owner of the incineration plant in Livorno, ordered to W.T.E to develop the technical feasibility study of theremoval of the existing steam condenser and of the erection of the new one with improved performances.
Feasibility study of new steam condenser (2009) Read More »
TOSSILO Spa, owner of the MSW incineration plant in Macomer, appointed W.T.E. to draft the technical and economical prefeasibility study giving: – the lay out and the dimensioning of a new incineration plant with 30 MWth capacity, to be built in the area of the existing one, operating with two fluidised bed furnaces; – grate
Feasibility Study of new waste to energy plant, 30 MWth (2010) Read More »
W.T.E. delivered to TOSSILO Spa project of a new combustion control system in order to allow the maximum reduction of pollutant emission, especially CO and TOC emissions, of the incineration plant in Macomer operating with two fluidised bed furnaces. The analysis and tests made by W.T.E. specialists pointed out some critical aspects of the process
Combustion control system of CO emission from FBC (2010) Read More »
Modifications of existing lines, with installation of booster fans W.T.E. was ordered to deliver a feasibility study of the upgrade of booster fans allowing the discharge of combustion fumes, one fan for each line of the incineration plant with fluidised bed technology in Macomer. In the project the new fans are placed before the existing
Feasibility study of installation of booster fans, wte plant in Macomer (2010) Read More »
Asstistance and supervision concerning energy efficiency of thermal cycle
Analysis of the energy efficiency of thermal cycle Read More »
Development of detailed engineering related to revamping of Cremona MSW incineration line 1 and supply of the new concept variable pressure auxiliary boiler.
Design and supply (2007) Read More »
W.T.E. signed a contract with ATZWANGER AG for the design of two boilers (20 tons/hour steam, T=370 øC, p=36 bar), to be installed at the AAMPS Livorno incineration plant. The contract included the expediting activity, the design of the combustion control system and the training of operators and management of the plant. The boilers were
Design of two HRSG on a waste to energy plant (2007) Read More »
W.T.E. supported MAIRE Tecnimont in offering for the new MSW incineration plant in Gerbido (Torino); technical specifications were delivered.
Offer engineering for a new EfW Plant (2007) Read More »
W.T.E. prepared technical specifications necessary for the project of a new receiving and grinding system of bulky waste, in the waste to energy plant owned by ACEGAS Aps- Padova.
Engineering of a loading system for bulky waste on wte plant (2008) Read More »