Engineering of a new grinding-feeding system for incineration plant (2010)

W.T.E. provided to the Client, TOSSILO Spa, the project of a new grinding & feeding system to be installed on the existing incineration plant, in Macomer (Sardinia). The new feeding system was required suitable for non sorted waste brought to the plant with large dimension. The project developed opted for a significant modification of the

Engineering of a new grinding-feeding system for incineration plant (2010) Read More »

Prefeasibility of the conversion of 2 EfW furnaces from fluidized bed to moving grate (2009)

Pre-feasibility study of the convertion of the combustion system installed on the incineration plant  owned by Veolia Servizi Ambientali Tecnitalia Spa in Gioia Tauro (RC). The existing fluid bed furnaces were fed with RDF and they would be transformed into moving grate furnaces fed with MSW. The capacity of the plant was 49 MWth. W.T.E.

Prefeasibility of the conversion of 2 EfW furnaces from fluidized bed to moving grate (2009) Read More »

Design & supply of new combustion control system on 3 lines MSW plant (2009)

VEOLIA entrusted W.T.E. with troubleshooting the excessive CO levels in the exhaust gas, measured at the unique stack, used by three lines. The plant was owned by Vercelli Energia and managed by VEOLIA. W.T.E. designed and delivered a combustion control system, to be implemented on an existing DCS, and supplied all necessary new instruments. The