Feasibility study (2003)
Feasibility study for replacement of the existing system to feed medical wastes on Waste to energy plant in Cremona. Owner AEM Gestioni Srl.
Feasibility study (2003) Read More »
Feasibility study for replacement of the existing system to feed medical wastes on Waste to energy plant in Cremona. Owner AEM Gestioni Srl.
Feasibility study (2003) Read More »
Technical and economical viability of a MSW incineration plant (2 x 47 MWth lines, thermal cycle with 19 MWe T/G)
Feasibility study of a wte plant (2003) Read More »
The GPC Gruppo Public Consult Spa committed to W.T.E. the expediting and the vendor compliance audit during the manufacturing of a steam boiler of 20 tons/hour to be installed on the third line of the waste to energy plant sited in Schio (Italy).
Expediting and vendor compliance of boiler (2002) Read More »
Consulting on untimely collapse of furnace roof occurred on the waste to energy plant managed by ACCAM sited in Busto Arsizio (Varese)
Consulting on failure (2002) Read More »
CON.SER.VCO, the owner of the incineration plant sited in Mergozzo (VCO), needed a detailed report on the actual state of the refractory lining in the furnaces. W.T.E. delivered an objective analysis about the conditions of furnace walls and some suggestions concerning maintenance and refurbishment costs .
Engineering services (2002) Read More »
AMA SpA needed a consulting on start-up transients of auxiliary burners installed on rotary kiln of incineration plant and related postcombustion chambers. W.T.E. delivered: evaluation of burners power required in order to maintain the temperature in postcombustion as per regulations in force; evaluation of burners power in order to guarantee a ramp rate of heating
Consulting on burner start-up transients (2002) Read More »
W.T.E. designed, engineered and delivered the system for collection and separation of rain water system to be installed on the waste to energy plant SILLA II, owned by AMSA SpA in Milano. The new design considered a passive system for separation of first rain water to be collected in a dedicated tank. The new system
Design and supply water treatment (2002) Read More »
GPC Gruppo Public Consult Spa committed to W.T.E. the expediting and the vendor compliance audit during the refractory laying of furnace installed in third line of waste to energy plant located in Schio (Italy).
Expediting and vendor compliance of refractory (2002) Read More »
Design of two new and more effective fabric bag filters, Mergozzo MSW incineration plant
Basic Engineering for up grading flue gas cleaning system (2002) Read More »
The ORTOLAN Srl company gave to W.T.E. the role of general consultant for the engineering to present a complete project for urban waste management to the public authorities in Ankara (Turkey) The project included: 300.000 tons/year MSW incineration plant (3 x 52 MWt lines, complete with T/G, dry and wet APC system, auxiliary landfill for
General Consultant-Engineering of complete waste treatment system (2001) Read More »