Waste to energy plant

Design and supply (2003)

AEM Gestione Srl ordered to W.T.E. the replacement of the system to feed furnace with medical waste, installed on the Line n.1 of the incineration plant in Cremona. The new system included an innovative solution to insure cooling with water collected from the existing boiler. Capacity: 2 lines of 17,8 MWth : 198 t/d x

Design and supply (2003) Read More »

Engineering services

Feasibility study: integration of a 3 x 61 MWt MSW incineration plant with a combined turbogas cycle (2004)

A.M.S.A. Spa owner of the MSW incineration plant in Milan, needed a technical and economical viability of the integration of a 3 x 61 MWt MSW incineration plant with a turbogas cycle. W.T.E. studied the impact on generation performances was developed by the analysis of 24 different operational functioning, related to weather conditions during the

Feasibility study: integration of a 3 x 61 MWt MSW incineration plant with a combined turbogas cycle (2004) Read More »

Offer engineering (2002)

Daneco Impianti SpA ordered to W.T.E. the engineering for offer related to a project of a new waste to energy plant to be realised in Messina(Sicily). The plant would process 430.000 tons per year of municipal solid waste by three lines of 62.5MWth-53 MWe. W.T.E. delivered basic engineering, all technical specifications, metric calculations of main

Offer engineering (2002) Read More »