Technical Consultation TMZ Trezzo sull’Adda (2023)
Technical report on maintenance interventions to be carried out in the upcoming two-year period.
Technical Consultation TMZ Trezzo sull’Adda (2023) Read More »
Technical report on maintenance interventions to be carried out in the upcoming two-year period.
Technical Consultation TMZ Trezzo sull’Adda (2023) Read More »
Contract for the production of the documentation necessary for the renewal of the operating permit for the A.AM.P.S. waste-to-energy plant.
Documentation for the Renewal of the Environmental Authorization (A.I.A.) (2023) Read More »
Support and direct drafting of all the documents required by law in order to obtain the review of the authorisation (A.I.A. Italian document) of the operating WtE plant (expertise, review overhaul and complement of documentation, compliance with the BAT). New design of the pumping station of the water feeding system.
Design and implementation of burners control logic installed in the post- combustion of two lines in waste-to-energy plant. Expertises about refractory and Condenser malfunctioning.
Writing and implementation of the control logic of the burners. WtE plant (2023) Read More »
Assistance to due diligence related to already existing waste-to-energy plant, delivering analysis of Capex, Opex and KPI
Technical Analysis on a waste-to-energy plant (2023) Read More »
Feasibility study to life extension and BAT adaptation of Trezzo incineration plant including engineering for organic slurry receiving, storage, and handling to co-combustion to two exisiting wastetoenergy lines
Feasibility study to life extension and BAT adaptation (2021) Read More »
Preliminary feasibility study to life extension and BAT adaptation of Trezzo incineration plant including preliminary engineering for organic slurry receiving, storage, and handling to co-combustion to two exisiting wastetoenergy lines
Life extension and BAT adaptation of Trezzo incineration plant (2021) Read More »
Preliminary engineering, feasibility study and design of a rotary kiln system, including energy recovery and multistage gas cleaning system. The micro-plant would be meant to treat RDF derived from the recycling of lead-acid batteries
Rotary kiln system for RDF from lead-acid batteries. Feasibility study (2021) Read More »
Preliminary dimensioning of two boilers for incineration plants, whose space was pre-assigned. In this project W.T.E. was required to study the special layout of the boiler and the flue gas cleaning system, due to the mandatory design set by the client.
Preliminary design of two boilers for incineration plant- ACboilers (2020) Read More »
Preliminary engineering for the revamping of the incineration plant in Trezzo s.A. including, in addition, a technical report on its conservation status and the feasibility study ex dlgs 50/2015.
Prefeasibility study of revamping- Trezzo incineration plant- FALCK RENEWABLES (2020) Read More »