Tuning of combustion control system (2011)
GEOFOR Spa, owner of the incineration plant in Pisa appointed W.T.E. to study the optimization of the combustion delivering a whole control system to reduce the emission of pollutants. The plant had 2 lines, 15 MWt each, fed by MSW/RDF. The implemented logic enhances the level of quality and quantity of combustion by means of […]
Tuning of combustion control system (2011) Read More »