Prefeasibility study of revamping- Trezzo incineration plant- FALCK RENEWABLES (2020)
Preliminary engineering for the revamping of the incineration plant in Trezzo s.A. including, in addition, a technical report on its conservation status and the feasibility study ex dlgs 50/2015.
Prefeasibility study of revamping- Trezzo incineration plant- FALCK RENEWABLES (2020) Read More »