Feasibility study of a wte plant (2003)
Technical and economical viability of a MSW incineration plant (2 x 47 MWth lines, thermal cycle with 19 MWe T/G)
Feasibility study of a wte plant (2003) Read More »
Technical and economical viability of a MSW incineration plant (2 x 47 MWth lines, thermal cycle with 19 MWe T/G)
Feasibility study of a wte plant (2003) Read More »
Feasibility study for replacement of the existing system to feed medical wastes on Waste to energy plant in Cremona. Owner AEM Gestioni Srl.
Feasibility study (2003) Read More »
W.T.E. was required to deliver the feasibility study of a new flue gas cleaning system and flue gas duct layout to be installed on an industrial plant, owned by Corazzi Fibre, a leading company in the production of non woven abrasive web.
Feasibility study of flue gas cleaning system (2001) Read More »
W.T.E. delivered a feasibility study of a new flue gas cleaning system to be installed on the hazarodus wastes incineration plant owned by BIOSUD Srl -Lecce
Feasibility study (2000) Read More »
In the project of major revamping of the waste to energy plant in Pisa, the owner GEA Spa appointed W.T.E. to analyse and describe the actual state of the main sections of the plant (pit with travelling cranes; refractory of furnaces, grates, postcombustion, feeding system,ashes conveyors, feeding of hospital wastes), of structures, of auxiliaries services,
Feasibility study of major revamping wte plant (2001) Read More »
The ORTOLAN Srl company gave to W.T.E. the role of general consultant for the engineering to present a complete project for urban waste management to the public authorities in Ankara (Turkey) The project included: 300.000 tons/year MSW incineration plant (3 x 52 MWt lines, complete with T/G, dry and wet APC system, auxiliary landfill for
General Consultant-Engineering of complete waste treatment system (2001) Read More »