Feasibility Study

Feasibility study: co-combustion sewage sludges and MSW (2007)

Study to ascertain the viability of disposing organic sludges from a nearby waste water treatment facility on the two lines of Cremona incineration facility. The solutions proposed by W.T.E. were tested on field. W.T.E. indicated main benefits obtained from co-combustion of sewage sludges with MSW : recovery of energy content of sewage sludges; total sanification

Feasibility study: co-combustion sewage sludges and MSW (2007) Read More »

Feasibility study of a biomass+RDF plant 2×30 MW, Castelnuovo G.na (2007)

Biomass/RDF energy system composed by 2 x 30 MWt furnaces. Design of air treatment system according to best available technology (BAT) Il progetto proposto ha previsto due linee da 17 MWt ciascuna, per la termovalorizzazione di biomasse costituite da legno non trattato, proveniente dalle operazioni di pulizia dei boschi, tale da permettere l’erogazione a pieno

Feasibility study of a biomass+RDF plant 2×30 MW, Castelnuovo G.na (2007) Read More »

Feasibility study (2005)

Troubleshooting and availability improvement  of the thermal cycle installed on incineration plant owned by A.AM.P.S. in Livorno (turbogenerator 6.7 MWe gross). Following this study W.T.E. received the order to carry out the revamping of thermal cycle and auxiliaries.

Feasibility study (2005) Read More »

Pre-feasibility study of furnace replacement on EfW plant (2005)

W.T.E. was encharged to study the replacement of the existing furnace system of the MSW incineration plant managed by SE.VER.A in Castelnuovo G.na. The object of the prefeasibility study was to indicate: – the project of converting the existing furnace by its modification  from “adiabatic” to “non adiabatic” ,with the minimum adaptation of the other

Pre-feasibility study of furnace replacement on EfW plant (2005) Read More »

Engineering services

Feasibility study: integration of a 3 x 61 MWt MSW incineration plant with a combined turbogas cycle (2004)

A.M.S.A. Spa owner of the MSW incineration plant in Milan, needed a technical and economical viability of the integration of a 3 x 61 MWt MSW incineration plant with a turbogas cycle. W.T.E. studied the impact on generation performances was developed by the analysis of 24 different operational functioning, related to weather conditions during the

Feasibility study: integration of a 3 x 61 MWt MSW incineration plant with a combined turbogas cycle (2004) Read More »