Engineering for revamping of hospital waste plant (2003)
WTE was appointed by MATEC to verify the equipment status of medical waste incineration plant after a destructive explosion occurred during first start up. The plant was located in Paderno Dugnano. Major damages on boiler and gas cleaning system were recorded. After the analysis WTE was designated to deliver the general project of the revamping […]
Engineering for revamping of hospital waste plant (2003) Read More »