Engineering

Offer engineering (2002)

Daneco Impianti SpA ordered to W.T.E. the engineering for offer related to a project of a new waste to energy plant to be realised in Messina(Sicily). The plant would process 430.000 tons per year of municipal solid waste by three lines of 62.5MWth-53 MWe. W.T.E. delivered basic engineering, all technical specifications, metric calculations of main

Offer engineering (2002) Read More »

Basic and detail engineering of Fly ash conveying system (2001)

In the ambit of major revamping of the waste to energy plant owned by ECOFOR (ex GEA) in Pisa, W.T.E. delivered basic and detailed engineering for a mechanical conveying system ashes coming from boilers and from gas cleaning section. W.T.E. provided:  calculation of ashes production;  calculation of nominal capacity of each machinery installed; the project

Basic and detail engineering of Fly ash conveying system (2001) Read More »

Engineering services

Engineering services (2001)

ALSTOM required to W.T.E. to develop: the coordination between all different control systems installed on the waste to energy plant (GEA-Pisa) the draft of commissioning and start-up procedures of the whole plant, with special analisys of procedures for furnaces; study of testing  procedure methodic.

Engineering services (2001) Read More »

Offer engineering (2002)

Daneco Impianti SpA ordered to W.T.E. the engineering for offer related to a project of a new waste to energy plant to be realised in Sassari (Sardinia). The capacity of the plant would be 270.000 tons/year of municipal solid waste to be incinerated by two lines of 35 MWth-17 MWe. W.T.E. delivered basic engineering, all

Offer engineering (2002) Read More »