Study of a mechanical dedusting system for ZnO dust (2004)
Study of a mechanical de-dusting system (cyclone) for ZnO dust, to be used in chemistry industries.
Study of a mechanical dedusting system for ZnO dust (2004) Read More »
Study of a mechanical de-dusting system (cyclone) for ZnO dust, to be used in chemistry industries.
Study of a mechanical dedusting system for ZnO dust (2004) Read More »
Consulting and draft of blueprints, lay-out of flue gas desulphuration (FGD) systems, Endesa Los Barrios 6 Litoral 1 Power Plants, Spain
Engineering services (2004) Read More »
Improvement of handling and feeding system of ferrous materials sorted from MSW, AMSA-Milano “Silla 2” incineration plant.
Improvement on handling system of ferrous materials sorted from MSW (2003) Read More »
In the ambit of fly ashes handling system installed in AMSA – Milano incineration plant, WTE was appointed to carry out the feasibility study for an air cleaning system. The air was drawn from the unloading fly ashes area, located in the fly ashes inertisation plant.
Feasibility study of air cleaning system (2003) Read More »
Daneco Impianti SpA ordered to W.T.E. the engineering for offer related to a project of a new waste to energy plant to be realised in Messina(Sicily). The plant would process 430.000 tons per year of municipal solid waste by three lines of 62.5MWth-53 MWe. W.T.E. delivered basic engineering, all technical specifications, metric calculations of main
Offer engineering (2002) Read More »
Design of two new and more effective fabric bag filters, Mergozzo MSW incineration plant
Basic Engineering for up grading flue gas cleaning system (2002) Read More »
In the ambit of major revamping of the waste to energy plant owned by ECOFOR (ex GEA) in Pisa, W.T.E. delivered basic and detailed engineering for a mechanical conveying system ashes coming from boilers and from gas cleaning section. W.T.E. provided:Â calculation of ashes production;Â calculation of nominal capacity of each machinery installed; the project
Basic and detail engineering of Fly ash conveying system (2001) Read More »
W.T.E. provided detailed engineering to METRIO tecnologia Srl for many projects including the draft of gas dampers, shutters, blanking plates. Final Clients of those projects were big company such as ENEL, ANSALDO
Engineering services (2001) Read More »
ALSTOM required to W.T.E. to develop: the coordination between all different control systems installed on the waste to energy plant (GEA-Pisa) the draft of commissioning and start-up procedures of the whole plant, with special analisys of procedures for furnaces; study of testing procedure methodic.
Engineering services (2001) Read More »
Daneco Impianti SpA ordered to W.T.E. the engineering for offer related to a project of a new waste to energy plant to be realised in Sassari (Sardinia). The capacity of the plant would be 270.000 tons/year of municipal solid waste to be incinerated by two lines of 35 MWth-17 MWe. W.T.E. delivered basic engineering, all
Offer engineering (2002) Read More »