Combustion tests at the start up plant (2010)
Combustion tests at the start up plant
Combustion tests at the start up plant (2010) Read More »
Combustion tests at the start up plant
Combustion tests at the start up plant (2010) Read More »
Coordination of Distributed Control System (DCS) engineering
Coordination of Distributed Control System (DCS) engineering (2008) Read More »
W.T.E. supported TBF AGÂ in the engineering of the feasibility study for the feasibility study of new AMSA Milano 61.5 MWt incineration plant.
Engineering services (2003) Read More »
W.T.E. developed the structural engineering of the silos to be erected in a gravel pit. During the construction serious structural faults arised and W.T.E. was appointed to verify calculation and carry out the remediation project in order to reinforce the load-bearing structure. Final client Cava ARMATI- Sovere (BG)
Structural engineering of gravel silos installed in a pit (2003) Read More »