Engineering services (2023)
Engineering services for development of several projects for process and design of new waste to energy and sludge treatment plant.
Engineering services (2023) Read More »
Engineering services for development of several projects for process and design of new waste to energy and sludge treatment plant.
Engineering services (2023) Read More »
Following the previous engineering services provided, Redecam Group asked to W.T.E. to update the flow control diagrams of the gas cleanign system of a biomass to energy plant
Control logic for an industrial dry gas cleaning system (2021) Read More »
The Client required a technical expertise in order to clarify some controversial issues related to the failure of the system. W.T.E. has compared all running data, all reports, all previous investigations and has provided its advice, basing also on theoretical assumptions.
Settlement of disputes (2021) Read More »
Drafting documents as required for defining the offer price of four systems for storage and dosing the Ammonia installed on four Power plants- ENEL
W.T.E. provided engineering services to Redecam Group in the project of a new Flue Gas Cleaning System – dry type
Engineering services (2017) Read More »
Redecam Group Spa and W.T.E. signed an agreement concerning the provision of engineering services, precisely of the process engineering and technical consulting in the field of gas cleaning system (Sodium-bicarbonate Dry Flue Gas Cleaning System)
Engineering services (2017) Read More »
Engineering services to receive GSE permitting for a 2.4 MWe Biomass to Energy plant.
Engineering and permitting services (2013) Read More »
ATENA, owner of the wte plant in Vercelli,  decided for a short revamping and a new start up of the incineration plant after a long inactivity period. W.T.E., who previously delivered the automatic combustion control for the three lines of incineration, was in charge of the start-up assistance and of training new operators in using
Start up and operator training of a waste to energy plant (2013) Read More »
After the start-up of the MSW incineration plant in Vercelli and some years of running, , the plant management needed an additional support to optimize the combustion control system, previously delivered by W.T.E., due to the increased variability of the urban waste composition and higher heating value, caused by the spot presence of hazardous waste.
Tuning of combustion control system (2011) Read More »
ALSTOM POWER Italia required the provision of QA/QC engineering services. The quality plan referred to a Project of an upgrading of desulphurisation system on an existing waste to energy plant (Brescia). The main scope of work included reducing emissions of sulphur oxides (SOx) at the stack and optimising the consumption of chemicals in the meantime.
Engineering services for QA/QC (2012) Read More »