Basic Engineering of a 49,5 MWt Biomass plant (2009)
Basic Engineering, including technical specifications and offer’s alignment, was delivered to COMART, a company of Gruppo Tozzi . The scope of the project was the installation of a new Biomass Plant with 50 MWt maximum capacity, fed by wood chips and olive oil residues. The site of the new plant was nearby Reggio Calabria.
Basic Engineering of a 49,5 MWt Biomass plant (2009) Read More »