Technical Analysis on a waste-to-energy plant (2023)
Assistance to due diligence related to already existing waste-to-energy plant, delivering analysis of Capex, Opex and KPI
Technical Analysis on a waste-to-energy plant (2023) Read More »
Assistance to due diligence related to already existing waste-to-energy plant, delivering analysis of Capex, Opex and KPI
Technical Analysis on a waste-to-energy plant (2023) Read More »
Consulting to get INAIL approval for the revamping of the pressure parts modification of three utility boilers installed on the Ilva steel mill plant (Taranto) in the ambit of the delivery of three new gas cleaning system
Consulting on the special layout of the boiler and on the flue gas cleaning system to be installed on a biomass to energy plant.
Preliminary evaluation of revamping boiler of WTE plant in Lucena- ACboilers (2020) Read More »
W.T.E. provided engineering services to Redecam Group in order to elaborate the flow control diagrams of the gas cleanign system of a biomass to energy plant
Process engineering for a gas cleaning system -REDECAM GROUP Spa (2020) Read More »
Qualified consulting on the performances of the existing Venturi measuring system installed in the EfW plant owned by AEM Gestioni Srl- Cremona
Consulting on Venturi system EfW plant-AEM Gestioni (2009) Read More »
An Italian Joint venture delivered an ORC energy recovery system in the revamping project of an existing waste incineration plant. Some major problems were recorded after the start up. W.T.E. was required to evaluate the solution proposed by JV in order to avoid litigation with their Client.
Consulting about boiler malfunctioning failures (2017) Read More »
Dal Sterling appointed W.T.E. to support an expertise about a litigation over a gas distribution network to be completed in Italy by an Italian company
Engineering services for legal advice (2019) Read More »
W.T.E. was appointed by Prima Srl, a Falck Renewables company, to study the optimization of the thermal cycle of the MSW plant, in Trezzo d’Adda, in order to power the future district heating network.
Improvement of the energy efficiency of the thermal cycle (2016) Read More »
Terni Biomassa Srl commissioned the analysis of the combustion process to W.T.E. in order to verify the capacity of the boiler fed by RDF.
Consulting about malfunctioning (2017) Read More »