W.T.E. delivered basic and detailed engineering to upgrade an existing biomass boiler with 57 MWt at MCR and to build a new thermal cycle with a turbo-generator 14.5 MWe capacity.
The project included also the revamping engineering of the existing boiler with the installation of a new superheater, able to deliver higher steam temperature, the extension of the existing economizer and a new combustion control system. Â All these systems and auxiliaries had to be connected to the existing chemical factory.