ABET Laminati SpA had high energy consumption in the processes: through a third party (CRESM)they appointed W.T.E. to study the optimization of the existing combustion process and a new co-generative thermal cycle.
The processed fuels are industrial by-products, very reach in ashes, which frequently plug furnace and boiler.
W.T.E. delivered a feasibility study that concerned a new boiler, tail end type, cleaned by automatic hammering, a thermal cycle with a counter pressure turbine and a new gas cleaning system