Pre-feasibility study of the convertion of the combustion system installed on the incineration plantĀ owned by Veolia Servizi Ambientali Tecnitalia Spa in Gioia Tauro (RC).
The existing fluid bed furnaces were fed with RDF and they would be transformed into moving grate furnaces fed with MSW. The capacity of the plant was 49 MWth.
W.T.E. delivered the study including the description of all modifications to be realised on the main sections of the plant.