Daneco Impianti SpA ordered to W.T.E. the engineering for offer related to a project of a new waste to energy plant to be realised in Messina(Sicily).
The plant would process 430.000 tons per year of municipal solid waste by three lines of 62.5MWth-53 MWe.
W.T.E. delivered basic engineering, all technical specifications, metric calculations of main sections of plant (furnace-boiler, flue gas cleaning system, thermal cycle), drawings of parts and of assembly.