ALSTOM required to W.T.E. to develop:
the coordination between all different control systems installed on the waste to energy plant (GEA-Pisa)
the draft of commissioning and start-up procedures of the whole plant, with special analisys of procedures for furnaces;
study of testingĀ procedure methodic.