In the ambit of major revamping of the waste to energy plant owned by ECOFOR (ex GEA) in Pisa, W.T.E. delivered basic and detailed engineering for a mechanical conveying system ashes coming from boilers and from gas cleaning section.
W.T.E. provided: calculation of ashes production; calculation of nominal capacity of each machinery installed; the project of lay out and technical specifications; P&Id; description of control logic; assistance on site.