ECOLOGICA NAVIGLIO Spa (2018)

Thanks to its know-how, W.T.E. was selected to deliver the study of the new control system of the existing sludge drying plant to improve safety procedure switching from originally manual operation to an automatic one. W.T.E. also provided the related HAZOP through process analysis and management interviews. Basing on a suitable mathematical model, automation procedures were […]
TOSSILO SPA (2010)

Modifications of existing lines, with installation of booster fans. W.T.E. was ordered to deliver a feasibility study of the upgrade of booster fans allowing the discharge of combustion fumes, one fan for each line of the incineration plant with fluidised bed technology in Macomer. In the project the new fans are placed before the existing […]
