Investanas JSC (2023)

Investanas JSC (Vilnius) has assigned W.T.E. Waste to Energy Srl to design a complete incineration plant, including the basic and detailed design of a furnace-boiler system (tail-end type), a flue gas cleaning system, a fly ash handling and storage system, and all other auxiliary systems. Main data: 11,5 MWth capacity 100 % MCR; LHV from […]

LEDOGA SRL – Gruppo Silvateam (2021)

The basic engineering of a new CHPP 4MWt+3MWt was to include the study of the energetic optimization of the thermal sources available to the company and the project of the distribution of the heat within theinternal industrial network.

SIA V.L.K. (2018)

After an international public call for tender issued by Ventspils (LV) Authority, W.T.E. had assigned the job with the title: “Development of a construction design and technical specifications for the procurement of design, construction and supply of equipment within the boundaries of the project titled “Installation and Operation of a Refuse-Derived Fuel Regeneration Plant at […]

ATZWANGER SPA (2011)

W.T.E. was appointed to carry out expediting, quality control and engineering review for the new fired boiler, 60 MWth of capacity, to be installed on the MSW incineration plant in Bolzano. The boiler was mainly manufactured in India.

STC Srl (2007)

Design, manufacturing, supply start up and commissioning of a 24 MWt furnace fed by wasted biomass (wood chips, wine production waste, straw, kernel and stones), including auxiliaries and Process & Combustion Control. Maximum Quantity of biomasses to be burnt: 10 tonnes hour of grapes harvest and winery by-products at 1850 kcal/kg. LHV shall be in […]