TOSSILO SPA

Year
2010
Location
Macomer (NU) IT
Scope of Work
Up-grade
Industry
Waste to energy
Activity
Feasibility study
Objects
Boiler, Furnace
Technical Description

Modifications of existing lines, with installation of booster fans.
W.T.E. was ordered to deliver a feasibility study of the upgrade of booster fans allowing the discharge of combustion fumes, one fan for each line of the incineration plant with fluidised bed technology in Macomer.
In the project the new fans are placed before the existing ones and put between the way out of bag filter and the entrance into the SCR reactor.
W.T.E. delivered the control logics of the whole system.

Want to know how we can support your project?

We’re always ready to listen to new ideas, take on new challenges, and find customized solutions together.