PRIMA SRL - Falck Renewables Spa

Year
2018
Location
Trezzo d.A.(MI) IT
Scope of Work
Revamping
Industry
Waste to energy
Activity
Feasibility study
Objects
Complete System
Technical Description

A major Italian company, operating in the field of incineration and renewable energy, required W.T.E. to study the life extension of boilers installed on an existing incineration plant. Later, the analysis was extended to the whole plant. W.T.E. carried out the study for residual useful life evaluation through an analysis of ordinary and extraordinary maintenance with interviews to plant personnel, a statistical analysis of boiler thickness and an analysis of most frequent plant failures. After this, conceptual designs to retrofit gas cleaning system and thermal cycle have been done. A comprehensive final technical report, including suggested improvements for components and process as well as the assessment of CAPEX and OPEX for maintenance and plant revamping has been delivered.

Want to know how we can support your project?

We’re always ready to listen to new ideas, take on new challenges, and find customized solutions together.